EconomyLens.com
No Result
View All Result
Saturday, October 10, 2026
  • Home
  • Economy
  • Business
  • Markets
  • Tech
  • Editorials
EconomyLens.com
  • Home
  • Economy
  • Business
  • Markets
  • Tech
  • Editorials
No Result
View All Result
EconomyLens.com
No Result
View All Result
Home Other

Power, water, jobs: Google on India data centre concerns

Emma Reilly by Emma Reilly
October 10, 2026
in Other
Reading Time: 7 mins read
A A
2
20
SHARES
251
VIEWS
Share on FacebookShare on Twitter

Residents in Visakhapatnam are concerned about the potential impact a new Google data centre will have on the environment and their lives. ©AFP

Bengaluru (India) (AFP) – Construction of a massive Google data centre in the Indian city of Visakhapatnam has been met with resistance from residents who fear the impact on the environment and their lives. But the tech giant says its “gigawatt-scale” AI facility in southern Andhra Pradesh state — part of a $15 billion investment — will use air cooling systems, and not water from an area already facing shortages.

Related

Google faces backlash against India data centre

Trump urges Zelensky replacement as diesel row rages

Trump’s trade wars sting US manufacturers ahead of midterms

Trump, Zelensky clash over diesel deal as Russian strikes kill 21

Zelensky blasts diesel deal after Russian strikes kill 15

Alexander Smith, Google’s head of infrastructure and energy for the Asia-Pacific region, answered AFP’s questions about the project:

– How do you view the concerns?

Smith said Google takes questions raised by the public seriously. “Independent environmental assessments — covering grid stability, power supply, water risk, ecology, acoustics and more — are conducted 12 to 24 months before a project begins,” he said. “If there is insufficient power in a location, or if operating a data centre would mean taking power away from a community, Google will either find ways to develop more power, or it will not build there.”

The data centre — Google’s biggest “AI hub” outside the United States — is set to become operational in 2028. It is one of several huge new tech sites planned in Visakhapatnam, but activists are demanding a moratorium on new data centres across Andhra Pradesh until there is more evidence of their impact on the environment and local community. Smith called the project “a multi-decade commitment” that carries “an obligation to be a good neighbour.” “That means the watershed, the grid and the communities around our facilities must be better off for our being here.”

– What are its water and power needs?

As AI use accelerates, construction of power-hungry data centres is booming worldwide, especially in Asia. Critics say they will add demand to electricity grids still heavily reliant on planet-warming fossil fuels and place new pressure on often-stretched local water supplies to cool down hot servers. Google’s water assessment for Visakhapatnam “pointed to pressure on the local watershed,” Smith said. “That finding shaped our choice of cooling configuration from the outset,” with “advanced air cooling” chosen instead of water cooling. “For the freshwater consumed by non-cooling facility needs, Google is committed to replenishing 120 percent of the volume we consume across our operations by 2030,” he added. Google does not disclose site-level capacity figures for power. But the US giant “fully funds the cost of required power infrastructure upgrades.” “We are planning to invest in new clean energy projects — built above and beyond what regulations require — in Visakhapatnam,” Smith said.

– Why did Google choose Visakhapatnam?

A Finnish authority recently ordered work to halt on two Google data centre sites pending mandatory environmental assessments, and worried residents have also mounted protests in Visakhapatnam. To select global sites, Google looks for “proximity to customers and users, access to talent, potential for new clean energy and opportunities to establish mutually beneficial partnerships with local communities,” Smith said. “Visakhapatnam is one of the few places where all of these come together.” The city’s coastline also allows undersea cables to link Visakhapatnam to South Africa and Australia, “positioning Andhra Pradesh as India’s third major subsea hub,” Smith said.

– Will promised jobs benefit people?

Data centre opponents say the benefits of the vast warehouse-like sites rarely trickle down to local residents. Smith said that “a development of this kind is projected to generate approximately $688 million in local economic activity every year.” “For every job inside a Google data centre we support nine additional jobs in the surrounding community,” he added. “Over a typical three-to-five-year construction period, an average Google data centre development employs about 4,200 construction workers annually.” “Each facility is designed to operate for at least 20 years, and once live it sustains hundreds of specialist on-site roles,” he added.

© 2024 AFP

Share8Tweet5Share1Pin2Send
Previous Post

Trump urges Zelensky replacement as diesel row rages

Next Post

Google faces backlash against India data centre

Emma Reilly

Emma Reilly

Related Posts

Other

Proposed EU budget cut back in search for Christmas deal

October 10, 2026
Other

Trump hails Russia deal to release diesel as midterms loom

October 10, 2026
Other

Stocks rise as Trump says Russia to release diesel to world markets

October 9, 2026
Other

Turkey jails 2 journalists pending trial for fund crisis ‘misinformation’

October 10, 2026
Other

Massive debt puts France in a bind as investor doubts deepen

October 10, 2026
Other

Trump forms panel to probe US Fed governor Lisa Cook

October 10, 2026
Next Post

Google faces backlash against India data centre

0 0 votes
Article Rating
Subscribe
Notify of
guest
guest
2 Comments
Oldest
Newest Most Voted
  • Trending
  • Comments
  • Latest

New York ruling deals Trump business a major blow

September 30, 2024

Elon Musk’s X fights Australian watchdog over church stabbing posts

April 21, 2024

Women journalists bear the brunt of cyberbullying

April 22, 2024

France probes TotalEnergies over 2021 Mozambique attack

May 6, 2024

New York ruling deals Trump business a major blow

104

Ghanaian finance ministry warns against fallout from anti-LGBTQ law

74

Shady bleaching jabs fuel health fears, scams in W. Africa

71

Stock markets waver, oil prices edge up

65

Google faces backlash against India data centre

October 10, 2026

Power, water, jobs: Google on India data centre concerns

October 10, 2026

Trump urges Zelensky replacement as diesel row rages

October 10, 2026

Trump’s trade wars sting US manufacturers ahead of midterms

October 10, 2026
EconomyLens Logo

We bring the world economy to you. Get the latest news and insights on the global economy, from trade and finance to technology and innovation.

Your Privacy Choices

Pages

  • Home
  • About Us
  • Privacy Policy
  • Contact Us

Categories

  • Business
  • Economy
  • Markets
  • Tech
  • Editorials

Network

  • Coolinarco.com
  • CasualSelf.com
  • Fit.CasualSelf.com
  • Sport.CasualSelf.com
  • SportBeep.com
  • MachinaSphere.com
  • MagnifyPost.com
  • TodayAiNews.com
  • VideosArena.com
© 2026 EconomyLens.com - Top economic news from around the world.
No Result
View All Result
  • Home
  • Economy
  • Business
  • Markets
  • Tech
  • Editorials

© 2024 EconomyLens.com - Top economic news from around the world.